In addition to the GSE support tooling a wide range of maintenance fixturing
is undertaken and has been installed with aircraft operators world wide.
Click
C130 rear fuselage mating fixture built and tested at SGE required full certification
for use and is shown below undergoing final proof load testing of 19 Tonnes.